A dedicated project manager will be assigned for the duration of the project
Project schedule and status report to Motorola on a weekly basis
Coordinate installation with appropriate trades that the installation is dependent on for completion
Single point of contact for GC will be assigned
PM will attend all required status and safety meetings
PM will schedule weekly project calls for the duration of the project
Ensures cleanliness of the work environment
Design
RADIO ONE will provide all RF engineering services necessary to support ongoing construction.
Creation of iBwave designs for on air systems are based on documents provided.
Data Collection
Pre-and post-baseline data collection for public safety and Disney 2-way radio technologies will be performed
Documentation and testing will be performed and provided for AHJ approval and sign off for CO
Integration and Commissioning
Experienced in integrating large multi-sector systems for stadiums, arenas, university campuses, hospitals, office buildings, malls, subways, and high security buildings. The following will be performed for successful commissioning:
Radio One and the Safer Buildings Coalition have created this useful document to outline the Florida Fire Code: Existing Buildings Timetable.
Florida Fire Prevention Code (NFPA 1) requires in-building coverage. Certain building types (high-rise commercial and residential apartments) have been granted an extension.